Electroglass® Series 8000 Studio Furnaces

Prices in US Dollars • Effective May 2008

Glass Capacity
Pounds - Max Current
Idle Power Kilowatts Maximum Power

Add Steel Base

Furnace Without Steel Base
CAD Drawing Is Supplied
100 • 240 Volts - 60 Amps, Two Starbars®

< 2

14.4 kw

$2,000

$17,444

175 • 240 Volts - 65 Amps, Two Starbars® 2 15.6 kw  ª

$2,000

$19,995
250-A • 240 Volts - 75 Amps, Two Starbars® < 2.5 18 kw 

$2,100

$21,988
250-B • 240 Volts - Three Starbars®
90 Amps Single Ø, or 65 Amps, 3Ø (240V)

2.5

21.6 kw

$2,100

$23,500

350 • 240 Volts - Three Starbars®
95 Amps Single Ø, or 68 Amps 3Ø (240V)
3 22.8 kw ¨

$2,600

$26,250
450 • 240 Volts - Three Starbars®
100 Amps Single Ø, or 72 Amps 3Ø (240V)
4.5 24 kw

$3,200

$31,895
775 • 240 Volts,120 Amps Single Ø, 4 Starbars®
480 Volts, 65 Amps 3Ø, Six Starbars®
9.4 29 kw

$3,700

$59,800
1000 • 240 Volts,180 Amps Single Ø, 6 Starbars®
480 Volts, 65 Amps 3Ø, Six Starbars®

12

43.2 kw

$4,200

$77,160

250 • Bottom-drain Casting Furnace
100 Amps Single Ø, or 72 Amps 3Ø (240V)

5

24 kw

$3,800
Does Not Include Scafolding

$64,445

Glory Hole No. 1622 - 12", 8" and 6" Holes with Plug
240 Volts - 65 Amps, Two Starbars®
< 2 15.6 kw

Included in the Price

$18,500
Glory Hole No. 1630 - 12", 8" and 6" Holes with Plug
240V 95 Amps Single Ø, or 68 Amps 3Ø (240V)
Three Starbars®
< 3 22.8 kw

Included in the Price

$22,425
Fusing Kiln / Color Pot Furnace (Eight 16"-dia. Pots) 2 12 kw

Included in the Price

$21,950
Top Loading Annealer (Custom Sizes)
From 240 Volts, 25 Amps, both single Ø and 3Ø

NA

From 6 kw

Included in the Price

From $12,500

Front Loading Annealer (Custom Sizes)
From 240 Volts, 25 Amps, both single Ø and 3Ø
NA From 6 kw

Included in the Price

From $12,500

Notes:

Idle Power = the minimum kilowatts needed to maintain a full tank of glass at 2100ºF.
Melting Power = (Maximum Power) - (Idle Power).

Selecting a furnace without the steel base will result in a substantial savings. You will also avoid paying freight on the steel. In this case we supply CAD drawings so that you can have the base welded locally. Specifications are for standard structural steel in either inches or metric.

The 100-pound furnace can be upgraded in the future to the 175-pound capacity furnace, and the 450-pound furnace (2003 and later) can be upgraded to the new 775-pound capacity furnace.
Kits are available for modifying older furnace bases, so that one can upgrade to the next size furnace. In some cases the control panel will also need to be upgraded.

(ª) The cost to operate the 175-pound furnace in a production studio, working, charging, etc., is approximately $260/mo. At 7¢ / kwh (based on customer feedback). The 175 is an upgrade to the original 150-pound furnace. The 150 is no longer available, but we continue to supply all of the 150 refractory and other parts. The older 650-pound furnace has been replaced with the new 775; however, 650 parts remain available (please call for lead-time).

(¨) The 350-pound furnace costs approximately $350 per month at 7¢ / kwh in a production studio (based on actual electric bills).

The 250-B, 350, and 450 pound furnaces have three Starbars® with three SCR power controllers. Electrical dimensions are given for 240 volts, single phase. The ampere value is given for full power, which is used only during the melting of batch or cullet. If you have 3Ø, you can reduce the number of amperes required. Three phase is available in 208, 240, 277, 380, 400, 480, and 575VAC, 50/60 Hz, now at no additional cost.

All Series 8000 furnaces now include as standard (1) the new Electroglass® stainless steel Control Console with a state-of the art, Honeywell UDC 2500 microcomputer for programming glass fining-time / temperature profiles, and (2) a foot-actuated, pneumatically operated, new stainless steel, door assembly, pre-fitted with high temperature air plumbing. The door which is magnetically coupled to an air piston, rides on a rodless, glide rail system.

Starbars®

Our heating elements are made from the mineral moissanite (silicon carbide), custom manufactured to Electroglass® specifications. Starbars® have a usefull life of up to two years in the two-element furnaces, and longer in the larger furnaces with three or more elements. Rebecca Stewart at R. Stewart Glass Blowing, who worked with a 450-pound capacity furnace, reported element life exceeding 4 years. It takes about ten minutes to replace an element while the furnace is at working temperature. A cold element can be placed directly into a hot furnace. Elements do not thermal shock, and are not damaged by most powdered glass batches.

Installation Service and Technical Support

For on-site assembly and startup service for most locations within North America, add $6000. For most locations in Asia, Europe, and South America, add $12000. Technical support is free, 24 hours, 7 days per week by phone/fax: US 269-668-2855 or by e-mail: support@electroglass.com

Purchase Terms and Business Leases

If we ship from inventory, terms are prepayment with your purchase order. If the furnace is not in inventory, and we have to cast the refractory parts, a 50-percent deposit is required with the order. The balance is due at the time of shipment. Customers outside of the United States should arrange to wire funds to our bank. Prices are F.O.B. Portage, Michigan, USA. We offer a 50-percent freight discount for shipments within the United States. Business leases start at about $225/month for sixty months with a $1.00 buyout at the end of the lease. A security deposit in the amount of the first and last month's payment may be required. Business lease payments are tax deductable, and interest rates may vary, depending upon credit and the prime rate at the time the lease is negotiated.  

How to EARN $37,500 from the IRS!

The U.S. Government actually pays you to buy new equipment. Under IRS Section 179, your business can lease equipment and deduct up to $125,000 as an immediate tax write-off the first year the equipment is placed in service. If you are in the 30% income tax bracket, your cash savings could be as much as $37,500 !

 Lease Application

Electroglass® and Pacifica Capital can offer you a flexible leasing/financing program to meet your needs. To learn more about the advantages of leasing/financing, such as tax savings and enhanced cash flow, please call Steve Sinotte at Electroglass®, 269-668-2855, or Philip Hof at Pacifica Capital, 800-800-8081 Ext. 222 or complete an application now, and apply by telephone — often same day approval.
 

Example 60-Month Leases • Call (269) 668-2855
Prices are subject to change without notice.

Furnace Cost
Approx. Monthly Payment
100-pound

$17,444

$371

Glory Hole - 1622

$18,500

$394

175-pound

$19,995

$427

350-pound

$26,250

$560

Annealers

From $12,500

From $267

Buy term paper. Nice custom essay writing services online. Paper writing.